← Back to portfolio

Institutional · LED retrofit

Dufferin-Peel 2021 Group 1 LED Retrofit

Formerly / working name: 7 Mississauga school sites

Completed
Owner
Dufferin-Peel Catholic DSB
Architect
Barry Bryan Associates
Location
Mississauga
Sector
Institutional
Timeline
Substantial performance — August 2023
Status
Completed

About this project

The project

LED retrofit across 7 Mississauga schools counted as one project. Sites: St Margaret of Scotland CES; Metropolitan Andrei CES; Mary Fix CES; St Jerome CES; St John XXIII CES; St Gerard CES; Bishop Scalabrini CES.

Part of a long record

Dufferin-Peel 2021 Group 1 LED Retrofit is one of 2 projects Everstrong has delivered for Dufferin-Peel Catholic DSB; one of 5 Everstrong projects in Mississauga. Repeat owners and repeat architects are the clearest measure of how a contractor performs — they come back when the job went well.

How Everstrong works it

Owners, architects and sub-trades kept informed through the build — regular project updates, early flagging of issues, and a single point of contact from mobilization to project close out.

Similar scope on your capital plan?

Discuss a project